ONE has worked with an industrial client in Blue Ridge region of Virginia to design and install a petroleum cut-off wall on the bank of a major regional river.

The cut-off wall was designed, using hydrogeologic modeling, to stop a historic diesel plume from migrating into the river while still allowing groundwater to flow under the wall to recharge the river. The installation trench, and pre-installed recovery sumps, also serve as a product accumulation and recovery system.

A brief synopsis of the project is as follows: